Finland 120MW – Inspection and Control Before Delivery (Part 1)

Inspection and control of groundwork and electrical infrastructure — Finland 120 MW battery plant

The image is from our work with inspection and control of groundwork and electrical infrastructure in connection with the delivery of Sungrow's 120 MW battery plant in Finland, August 2025.

The work included review of foundations, cable infrastructure and preparation for installation, with a focus on quality, accuracy and compliance with technical requirements and specifications. This is crucial to ensure an efficient installation phase and stable operation of the facility.

Our team works systematically and with high precision to ensure that all preparatory work meets the required standard before delivery and installation of critical energy infrastructure.

We hold the highest level of electrical authorization within the EU, ensuring that all work is carried out in accordance with current regulations and the industry's strictest requirements.

Swegarb AS / Globe Energy Norway

Inspection and control of groundwork and electrical infrastructure — Finland 120 MW battery plant
Inspection and control of groundwork and electrical infrastructure — Finland 120 MW battery plant
Inspection and control of groundwork and electrical infrastructure — Finland 120 MW battery plant

Ready for a structured energy dialogue?

Contact us for a technical consultation. We'll help you with system assessment and optimisation — whether it's BESS, compressors or hybrid solutions.

Contact us